CLIENT
: OMK
CONTRACTOR
: STRABAG
Equipment Sup: SMS SIEMAG
Contract Date
: 01.12.2010 - 31.12.2011
Location
: RUSSIA / Vyksa
Work Scope
: RM-02 area between axes 20-30
Equipment erection and EF area equipment erection
&Piping Erection
OMK-VYKSA Iron and Steel Plant Stan-5000
CLIENT
: ÇOLAKOĞLU A.Ş.
Equipment Sup: SMS SIEMAG
Contract Date
: 01.04.2009 - 04.10.2010
Location
: TURKIYE/Dilovası
Work Scope
: Mechanical Erection Works &Piping of
Hotstrip Mill Project, included pickling and flushing and
commissioning works.
ÇOLAKOĞLU A.Ş. DILOVASI Iron &Steel Plant
CLIENT
: CJSC Ksiemp
CONTRACTOR
: GAMA A.Ş.
Equipment Sup: DANIELI
Contract Date
: 20.4.2011
Location
: RUSSIA / Obninsk
Work Scope
: Installation works of the Rolling Mill
and Equipment of Continuous Casting Section.
KEP-306 Projects KALUGA Electrometallurgical Plant
CLIENT
: MMK-ATAKAŞ
Equipment Sup: DANIELI
Contract Date
: 15.06.2010-31.05.2011
Location
: TURKIYE / İskenderun
Work Scope
: Mechanical and Steel Structure
Erection, Refractor lining, Piping Works of HDGL. CPL
pickling, CRM Tandem, ARP Acid Regeneration line, pipe
line insulation.
MMK-ATAKAŞ Iskenderun HDGL Plant
CLIENT
: MMK-ATAKAŞ
Equipment Sup: DANIELI
Contract Date
: 18.01.2010 - 31.05.2010
Location
: TURKIYE / Dilovası
Work Scope
: Mechanical and Steel Structure
Erection, Refractor lining, Piping Works of CCL and HDGL.
CPL pickling, CRM Tandem, ARP Acid Regeneration line,
pipe line insulation.
MMK-ATAKAŞ Dilovası Iron & Steel Plant
CLIENT
: BORÇELİK ÇELİK A.Ş.
CONTRACTOR
: ÇALIK ENERJİ A.Ş.
Equipment Sup: SIEMENS VAI
Contract Date
: 10.01.2008-04.12.2008
Location
: TURKIYE / Gemlik
Work Scope
: Turnkey Basis (except Civil)
Continuous galvanizing CGL3 Mechanical, Piping Electrical,
Instrumentation, Insulation Works.
BORÇELİK Continous Galvanizing Line CGL3 Plant
CLIENT
: BORÇELİK ÇELİK A.Ş.
CONTRACTOR
: ÇALIK ENERJİ A.Ş.
Equipment Sup: SIEMENS VAI
Contract Date
: 04.02.2008-31.12.2008
Location
: TURKIYE / Gemlik
Work Scope
: Turnkey Basis (except Civil) 3rd Cold
Rolling Line RCM3 Mechanical, Piping Electrical,
Instrumentation Works.
BORÇELİK 3rd Cold Rolling Line RCM3 Plant
CLIENT
: BORÇELİK ÇELİK A.Ş.
CONTRACTOR
: ÇALIK ENERJİ A.Ş.
Equipment Sup: SIEMENS VAI
Contract Date
: 21.01.2008 - 14.03.2008
Location
: TURKIYE / Gemlik
Work Scope
: CPL Continuous acidizing Lining
Equipment Erection Complete
BORÇELİK CPL Continuous acidizing Lining Equipment Erection
CLIENT
: LSTK-EPC
CONTRACTOR
: ASİL ÇELİK A.Ş.
Equipment Sup: SIDERIMPES
Contract Date
: 13.08.2011 - 10.05.2011
Location
: TURKIYE / Orhangazi
Work Scope
: Turnkey Basis (except Civil)
Installation of the Garret – Wire Rod line. Mechanical,
electrical, piping, I&C, Refractory, Insulation, Painting
works, erection All Mechanical, piping and electrical tests
and precommissioning.
ASİL ÇELİK Orhangazi Garret – Wire Rod line Plant
CLIENT
: TEZCAN GALVANİZLİ YAPI
ELEMANLARI SAN.VE TİC.A.Ş.
Equipment Sup: DANIELI
Contract Date
: 10.9.2008
Location
: TURKIYE / Kocaeli
Work Scope
: All kind of manufacturing and
installation works of the CGL with auixliary system.
TEZCAN KOCAELI CGL Line Plant
CLIENT
: DAIYANG METAL SANAYİ LTD.ŞTİ.
CONTRACTOR
: ÇALIK ENERJİ A.Ş.
Equipment Sup: Danieli
Contract Date
: 14.3.2008 - 05.09.2008
Location
: TURKIYE / Çorlu
Work Scope
: Installation works of the Cold Rolled
Stainless Steel Plant at the EUROPEAN Free Zone
DAIYANG Metal Cold Rolled Stainless Steel Plant
CLIENT
: Isdemir A.Ş.
CONTRACTOR
: MİMAG A.Ş.
Equipment Sup:
Contract Date
: 22.11.2005 - 02.07.2007
Location
: TÜRKİYE / İskenderun
Work Scope
: Isdemir Blast Furnace Pulvirise Coal
Injection Unit Mechanical Equipment & Piping & Steel
Construction Assembly Works.
İsdemir A.Ş. PCI Coal Injection Plant
CLIENT
: OMK
CONTRACTOR
: GAMA A.Ş.
Equipment Sup: DANIELI
Contract Date
: 3.4.2007
Location
: Russia / Vyksa
Work Scope
: Installation works of the Rolling Mill
and Equipment of Continuous Casting Section.
OMK-VYKSA Casting Rolling Plant